Why this rule decides your schedule
VDE-AR-N 4110 governs every storage plant connecting at medium voltage in Germany. Unlike markets where compliance is reviewed after energization, German DSOs require unit certificates before the connection agreement is signed — meaning your PCS choice fixes your certification timeline before civil works even start.
For 2026 projects the practical question is no longer “is the PCS certified?” but “is the certificate current against the grid-forming amendment?” — re-certification waves have caught several vendors mid-pipeline.
A missing or outdated unit certificate adds 4–7 months to a German interconnection. It is the single most common storage project delay we see in DACH tenders.
The certificates, in order
Three documents matter, and they build on each other:
- Unit certificate (Einheitenzertifikat) — issued per PCS model against FGW TR3 measurements.
- Component certificate — covers the protection interface (NA-Schutz).
- Plant certificate (Anlagenzertifikat) — project-specific, assembled by an accredited body from the two above plus your single-line design.
Requirements vs. Sineng IEC line
How the headline requirements map to shipping product — the full mapping matrix with test-report references is available to rated clients.
| Requirement | 4110 clause | SN-3450-UD | Evidence |
|---|---|---|---|
| LVRT / HVRT ride-through | §10.2 | Compliant | Unit certificate |
| Reactive power Q(U) | §9.4 | Compliant | Unit certificate |
| Grid-forming operation | 2026 amend. | Compliant | TR8 supplement |
| Frequency response FRT | §9.3 | Compliant | Unit certificate |
Frequently asked
Does an IEC 62477 certificate replace the German unit certificate?
Can one plant certificate cover a multi-phase build-out?
Which Sineng models hold current 4110 unit certificates?
Documents
Didn't find your answer? Ask the AI assistant — it reads every guide on this site — or send the question to the team.